午夜电影网一区_jizz内谢中国亚洲jizz_都市激情亚洲综合_特黄特色欧美大片

英文采購合同

來源: 律霸小編整理 · 2020-10-14 · 117人看過

Contract No.:XXX

Sales and Purchase ContractFOR

?Manganese Ore

This contract is made and entered into onXX, Feb2008under terms and conditions as per the international chamber of commerce-600 (ICC UCP-600/2007 revision) by and between:

The Buyer:


Address:


Tel:


The Seller :


Address:


Tel:


Whereby seller agrees to sell to buyer and Buyer agrees to buy from seller Manganese Ore under following the terms and conditions stipulated below:


Article 1 Commodity


Concentrated? manganese Ore


Article 2 Specifications

?

Concentrated? Manganese Ore

Size: 0-5mm (90% min)

% Mn min.?????? 40.0%

% Fe max.????? 15.0%

% Silica ( SiO2 ) max.????? 1.0%

% Aluminum ( Al ) max.????? 4.0%

% S max.????? 0.20%

% P max.????? 0.10%

Moisture max.????? 7%


Article 3 Quantity:

500 MT, partial shipment not allowed.

Article 4 Origin and Port of loading
4.1 Republic of ABC

4.2 Loading port:


Article 5 Packing/Delivery

5.1 In50 kg sack

5.2 Incontainer Shipment, more or less 20 tons.

Article 6? Shipment/Delivery

6.1 500MT(+/-5%)partial shipment not allowed

6.2 Shipment will be 90 days after signing of this contract and after the acceptance of the Letter of Credit by seller’s bank. L/C will be openedafter BuyerreceivingProforma Invoice from Sellerwith confirmation of the delivery schedule.

6.3 The Buyer has the right to appoint the independent surveyor or his representative to conduct the Pre-shipment Inspection and/or conduct the joint-inspection of the material with buyer for his own account.

?

Article 7 Contracted Price and Values

Price:Mn: 48% and above - USD0.00/%/DMTCFRCY Port, China

???????? 40% - 47.9%? - USD 0.00 /%/DMTCFRCY Port, China

?

The Mn content will be average of the joint-inspection testing result at loading port.

?

Article 8 Payment

8.1 Payment shall be effected in full by an irrevocable Letter of Credit, which will be opened by 1stclass bank in Hong Kong or Singapore, 100% at sight upon presentation of shipping documents.

A. Seller’s Banking Details:

Bank Name??????? :???????????????????????????????

Bank Address???? :???

Account Name???? :?
S.W.I.F.T. CODE SWIFT??? :


B. Buyer’s bank issues L/C to the Seller’s bank via S.W.I.F.T. wire transfer.

Buyer’s Banking Details:

Bank Name???????????????? : (will be advised)

Bank Address??? :?????????????????????????????????????

Account Name:????

S.W.I.F.T. Address SWIFT?? :??

Article 10 Inspection of Analysis & Weight

The shipmentinspection and analysis shall be done byCCICappointed by the Seller and one independent surveyor (i.e.: SGS or Geo-Chem, etc) appointed by the buyeras agreed by both parties at site before loading to container. While final weightand qualitydetermination shall be done atloadingportby the above joint-survey.Moisture content shall be deducted from the total weight shipped.

?

Article 11 Documents

Seller shall present the following documents to the buyer:

A.??? Signed Commercial Invoice for 100% of the total cargo value indicating, quantity, unit price and the total Amount of Value of the delivered commodity , 1 original and 3 copies.

B.??? Certificates of quantity, quality and weight issued byCCICand one independent surveyor appointed by the buyer.

C.?? Certificate of Origin issued by ABC Department Of Trade or concerned Government authorities, I original and 2 copies.

D.?? Weight List, showing total weight , 1 original and 3 copies.

E.??? Bill of Lading, 3 original copies and 3 non-negotiable copies.

Article 12 Force Majeure

The Seller shall not be responsible for the delay of shipment or non-delivery of the goods due to Force Majeureunder UCP 600. The seller shall advise the buyer immediately of the occurrence mentioned above and within 3 days thereafter the seller shall send a notice by courier to the buyer of their acceptance of a certificate of the accident issued by the local chamber of commerce under whose jurisdiction the accident occurs as evidence thereof. Under such circumstances the seller , however, are still under obligation to take all necessary measures to hasten the delivery of the goods. In case the accident lasts for more than 60 days the buyer shall have the right to cancel the Contract.

該內容對我有幫助 贊一個

登錄×

驗證手機號

我們會嚴格保護您的隱私,請放心輸入

為保證隱私安全,請輸入手機號碼驗證身份。驗證后咨詢會派發給律師。

評論區
登錄 后參于評論
法律合同 友情鏈接
主站蜘蛛池模板: 商水县| 麦盖提县| 大荔县| 永福县| 宁河县| 屏东县| 保德县| 兰西县| 茌平县| 昂仁县| 丽江市| 蕉岭县| 固镇县| 德昌县| 柏乡县| 托里县| 长岭县| 酒泉市| 济源市| 南充市| 抚州市| 潮安县| 和静县| 枣强县| 敖汉旗| 积石山| 金华市| 望奎县| 闻喜县| 同仁县| 讷河市| 涟源市| 临海市| 文山县| 金乡县| 洛南县| 汽车| 文安县| 武汉市| 蓬溪县| 杨浦区|